Changes in the norms and normative system of disposal facilities at the processing stage . When bidding for consulting services, no one participates, time is wasted by repeated announcements, and the tender is forced to choose only one material. Signing a contract with one consultant for a maximum of 5 jobs due to lack of contractors. In addition to the problems of lack of staff to develop norms and standards documents and the problems of being interrupted at one stage, the internal risk assessment conducted by the Ministry of Defense in 2021 concluded that there is a risk of "lack of professional staff to develop norms and standards documents, and several contracts are signed with the same organization." came out. Last year, we signed contracts with 67 consultants for the implementation of 152 projects. Of these, there are 2 consultants with five jobs and 2 consultants with four jobs, accounting for 12 percent of the total number of jobs. This clearly shows the lack of consultants and lack of staff.
What do you think should be done to solve the above problem?
In order to solve the problem, it is necessary to provide detailed foreign and domestic training to engineers and technical workers and consultants who will work on the development of normative documents, to define a personnel Qatar Mobile Number List training policy, and to issue, extend and advance the professional degrees of young engineers involved in the development of norms and rules ahead of time. Also, the assessment of the development of normative documents should be increased. Recently, we have approved a new procedure for calculating benchmarks for the development of norms by Order No. A/89 dated March 4, 2022. This is an increase from the previous estimate.
As for the last stage, the approval stage, the construction law was changed in 2017 and the road section was separated. According to the changes, the road sector has a separate norming fund, and the power sector is developing separate norms. Due to the development of separate norms and rules, overlaps and discrepancies of these norms have started to appear.
Therefore, any sector needs to follow the Resolution No. 106 of the Ministry of Land and Infrastructure. Due to the fact that there is no agreement between them, consolidation at the stage of technical tasks, approval of the document with a number by the Ministry of Education and Culture.
What do you think should be done to solve the above problem?
In order to solve the problem, it is necessary to provide detailed foreign and domestic training to engineers and technical workers and consultants who will work on the development of normative documents, to define a personnel Qatar Mobile Number List training policy, and to issue, extend and advance the professional degrees of young engineers involved in the development of norms and rules ahead of time. Also, the assessment of the development of normative documents should be increased. Recently, we have approved a new procedure for calculating benchmarks for the development of norms by Order No. A/89 dated March 4, 2022. This is an increase from the previous estimate.
As for the last stage, the approval stage, the construction law was changed in 2017 and the road section was separated. According to the changes, the road sector has a separate norming fund, and the power sector is developing separate norms. Due to the development of separate norms and rules, overlaps and discrepancies of these norms have started to appear.
Therefore, any sector needs to follow the Resolution No. 106 of the Ministry of Land and Infrastructure. Due to the fact that there is no agreement between them, consolidation at the stage of technical tasks, approval of the document with a number by the Ministry of Education and Culture.